Optimal Cost Overruns: Procurement Auctions with Renegotiation

Authors:

Herweg, Fabian (University of Bayreuth)
Schwarz, Marco A. (University of Innsbruck)

Abstract:

Cost overrun is ubiquitous in public procurement. We argue that this can be the result of a constrained optimal award procedure: The procurer awards the contract via a price-only auction and cannot commit not to renegotiate. If cost differences are more pronounced for a fancy than a standard design, it is optimal to fix the standard design ex ante. If renegotiation takes place and the fancy design has higher production costs or the contractor’s bargaining position is strong, the final price exceeds the initial price. Moreover, the procurer cannot benefit from using a multi-dimensional auction, i.e., under the optimal scoring auction each supplier proposes the standard design.

Keywords:

auction; cost overrun; procurement; renegotiation

JEL-Classification:

D44; D82; H57

Download:

Open PDF file

Optimal Cost Overruns: Procurement Auctions with Renegotiation
Tagged on: